Volume 40 - Issue 47 - November 25, 2021
State of Kansas
Department of Transportation
Notice to Contractors
Electronic copies of the letting proposals and plans are available on the Kansas Department of Transportation (KDOT) website at https://kdotapp.ksdot.org/Proposal/Proposal.aspx. The website will allow the contractor to request approval from KDOT to bid as a prime contractor and be included on the “Bid Holders List,” or to be included on the “Non-Bid Holders List” as a subcontractor/supplier. KDOT’s approval is required to bid as a prime contractor. To bid as a prime contractor, KDOT needs to be notified of the intent to bid no later than the close of business on the Monday preceding the scheduled letting date. Failure to obtain prior approval to bid as a prime contractor on any projects listed below will be reason to reject your bid. The Secretary reserves the right to reject bids that do not comply with all requirements for preparing a bidding proposal as specified in the 2015 edition of the Kansas Department of Transportation Standard Specifications for State Road and Bridge Construction.
KDOT will only accept electronic internet proposals using the Bid Express website at http://www.bidx.com until 1:00 p.m. (CST) December 15, 2021. The KDOT bid letting will be conducted remotely by audio broadcast ONLY at 3:00 p.m. (CST) Wednesday, December 15, 2021. To join the conference call, dial 866-620-7326 and enter conference code 5895748207. KDOT has tested the process, but in the event of an unforeseen issue, KDOT will provide updates.
Each bidder shall certify that such person, firm, association, or corporation has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the submitted bid. This certification shall be in the form of a required contract provision provided by the state to each prospective bidder. Failure to complete the required contract provision and certify the completeness of the preceding statement when electronically signing the proposal will make the bid nonresponsive and not eligible for award consideration.
District One – Northeast
Brown – 75-7 KA-5284-01 – US-75, from 260th Street north to 300 feet north of K-246 (280th Street) in Sabetha, intersection improvement, 2.1 miles. (Federal Funds)
Doniphan – 36-22 KA-6336-01 – US-36, from 1.4 miles east of the US-36/K-136 junction to the north city limits of Wathena, recycle and overlay, 6.1 miles. (State Funds)
Doniphan – 120-22 KA-6337-01 – K-120, from the K-120/K-20 junction to the south city limits of Highland, milling and overlay, 8.9 miles. (Federal Funds)
Jefferson – 44 C-4983-01 – Wellman Road, from 3,175 feet to 305 feet south of 142nd Street, roadside improvement, 0.6 mile. (Federal Funds)
Johnson – 7-46 KA-5933-01 – K-7, from Harold Street in Olathe north to the K-10/K-7 junction, overlay, 2.7 miles. (Federal Funds)
Osage – 35-70 KA-6075-01 – I-35, from the Rock Creek Bridge located 4.8 miles south of the Osage/Franklin County line north to the Osage/Franklin County line, overlay, 4.8 miles. (Federal Funds)
Osage – 35-70 KA-6126-01 – I-35, bridge #010 over Rock Creek located 0.6 mile east of the east K-31/I-35 junction, bridge repair. (Federal Funds)
Nemaha – 187-66 KA-3875-01 – K-187, bridge #029 over Weyer Creek located 2.8 miles north of the K-187/K-9 junction, bridge replacement. (Federal Funds)
Nemaha – 187-66 KA-3876-01 – K-187, bridge #032 over the Fisher Creek Drainage located 5.5 miles north of the K-187/K-9 junction, bridge replacement. (Federal Funds)
Wabaunsee – 31-99 KA-6316-01 – K-31, from the K-31/K-99 junction to the Wabaunsee/Osage County line, milling and overlay, 10.1 miles. (Federal Funds)
Wabaunsee – 195-99 KA-6339-01 – K-195, from the K-31/K-195 junction to the south city limits of Harveyville, milling and overlay, 0.4 mile. (State Funds)
District Two – North Central
Jewell – 128-45 KA-3947-01 – K-128, bridge #022 over White Rock Creek located 0.3 mile north of State Street in Burr Oak, bridge replacement. (Federal Funds)
Statewide – 106 KA-6106-01 – US-56, K-149, US-77, K-4, K-218 and K-177 in Morris, Chase, Dickinson, Geary, and Lyon counties, signing. (Federal Funds)
District Three – Northwest
Cheyenne – 27-12 KA-3933-01 – K-27, bridge #005 over the North Fork Beaver Creek located 1.3 miles north of the Cheyenne/Sherman County line, bridge replacement. (Federal Funds)
Ellis – 183-26 KA-5418-01 – US-183, from the south city limits of Hays north to 350 feet south of 13th Street, pavement reconstruction, 0.6 mile. (Federal Funds)
Norton – 9-69 KA-6310-01 – K-9, from the Decatur/Norton County line east approximately 16.2 miles to the west K-9/US-283 junction, milling and overlay, 16.2 miles. (Federal Funds)
Russell – 70-84 KA-6279-01 – I-70 and 200th Boulevard interchange at Exit 199 near Dorrance and K-18/K-232 intersection near Lucas, lighting. (Federal Funds)
Thomas – 83-97 KA-6308-01 – US-83, from the US-83/ US-24 junction northeast approximately 11.5 miles to the Thomas/Sheridan County line, milling and overlay, 11.5 miles. (Federal Funds)
District Four – Southeast
Bourbon – 39-6 KA-3912-01 – K-39, bridge #048 and Culvert #547 over Flat Rock Creek located 3.08 miles east of the Neosho/Bourbon County line, bridge replacement. (Federal Funds)
Bourbon – 3-6 KA-6303-01 – K-3, from the west US-54/K-3 junction to the Bourbon/Linn County line, milling and overlay, 10.0 miles. (Federal Funds)
Bourbon – 7-6 KA-6486-01 – K-7, from the east K-31/K-7 junction, north to the Bourbon/Linn County line, sealing, 1.5 miles. (State Funds)
Bourbon – 7-6 KA-6487-01 – K-7, from the west US-54/K-7 junction, north to the east K-7/K-31 junction, sealing, 14.8 miles. (State Funds)
Bourbon – 31-6 KA-6489-01 – K-31, from the east K-7/K-31 junction east to the US-59/K-31 junction, sealing, 7.0 miles. (State Funds)
Franklin – 35-30 KA-6076-01 – I-35, from the Osage/Franklin County line north 11.0 miles, overlay, 11.0 miles. (Federal Funds)
Labette – 400-50 KA-6304-01 – US-400, from the Montgomery/Labette County line to 8.8 miles east of the Montgomery/Labette County line (beginning of Portland Cement Concrete Pavement), milling and overlay, 8.8 miles. (Federal Funds)
Linn – 3-54 KA-6449-01 – K-3, from the Bourbon/Linn County line to the K-3/K-31 junction, milling and overlay, 3.0 miles. (State Funds)
Linn – 7-54 KA-6488-01 – K-7, from the Bourbon/Linn County line north to the south K-52/K-7 junction, sealing, 7.2 miles. (State Funds)
Miami – 68-61 KA-2373-02 – K-68, from Somerset Road (RS-1032) east for 0.8 mile, grading and surfacing, 0.8 mile. (Federal Funds)
Miami – 68-61 KA-2373-03 – K-68, various locations from US-169 east to US-69 junction at Louisburg, grading, bridge, and surfacing, 3.2 miles. (Federal Funds)
Miami – 69-61 KA-6055-01 – US-69, from 1.3 miles south of 359th Street north to 0.6 mile south of the K-68 junction, overlay, 10.8 miles. (Federal Funds)
Miami – 68-61 KA-6230-01 – K-68, from the US-69/K-68 junction east to the Kansas/ Missouri state line, milling and overlay, 4.5 miles. (Federal Funds)
Montgomery – 160-63 KA-6389-01 – US-160, from the east city limits of Independence to 0.37 mile east of north of the US-169/US-160 junction, milling and overlay, 6.3 miles. (State Funds)
District Five – South Central
Barber – 4 KA-6289-01 – K-2, from the US-281/K-2 junction to the Barber/Harper County line and K-8, from the Kansas/Oklahoma state line to the K-2/K-8 junction, milling and overlay, 17.6 miles. (State Funds)
Butler – 77-8 KA-6132-01 – US-77, bridge #032 over the West Branch Walnut River/Pedestrian Pass) located 0.65 mile north of the north US-54/ US-77 junction, bridge repair. (Federal Funds)
Cowley – 18 KA-6305-01 – K-15, from the Kansas/Oklahoma state line to the east K-15/US-166 junction and US-166, from the north US-166/US-77 junction to the Cowley/Chautauqua County line, milling and overlay, 36.3 miles. (Federal Funds)
Cowley – 77-18 KA-6333-01 – US-77, from the US-77/Summit Street junction north to the US-77/Madison Avenue junction, milling and overlay, 0.9 mile. (State Funds)
Sedgwick – 96-87 KA-6231-01 – K-96, from 0.60 mile east of N. Webb Road at the transition of the Hot Mill Asphalt and Portland Cement Concrete pavement east to the US-54/K-96 junction, pavement patching, 4.7 miles. (Federal Funds)
Statewide – 106 KA-6378-01 – Routes I-235, US-77, US-54 and K-196 in Sedgwick, Cowley, and Butler counties at various locations, rumble strip installation, 37.1 miles. (State Funds)
District Six – Southwest
Ford – 50-29 KA-2384-01 – US-50, from the Gray/Ford County line east to 1.7 miles east of US-50/US-400 junction, grading, bridge and surfacing, 8.6 miles. (Federal Funds)
Gray – 50-35 KA-2383-01 – US-50, from the east city limits of Cimarron east to the Gray/Ford County line, grading, bridge and surfacing, 6.9 miles. (Federal Funds)
Lane – 23-51 KA-6311-01 – K-23, from the Finney/Lane County line north to the Lane/Gove County line, overlay, 32.1 miles. (Federal Funds)
Lane – 96-51 KA-6334-01 – K-96, from the west city limits of Dighton east to 1st Street in Dighton, milling and overlay, 0.4 mile. (State Funds)
Scott – 83-86 KA-3252-01 – US-83, from the north city limits of Scott City (at the concrete/asphalt pavement transition) north to the Scott/Logan County line, milling and overlay, 15.0 miles. (State Funds)
Julie Lorenz
Secretary
Doc. No. 049570